DATE: 22-Dec-24
PORT: Finland - Porvoo
OIL MAJOR
INSPECTOR: Tor Tonnessen.
ELEMENTS |
SIRE 2.0 REF |
OBSERVATIONS |
PROCESS |
3.2.1 |
The static
navigational assessment report was not substantially in alignment with the
guidance document "A Guide to Best Practice for Navigational Assessments
and Audits" and the best practice guidance under TMSA KPI 5.2.2. |
PROCESS |
3.2.5 |
The cargo
audit report stated in the PIQ was part of the ISM audit and not a
comprehensive cargo audit in compliance with TMSA 6.4.2 |
PROCESS |
8.6.1 |
The operator
did not have a policy or PMS job for the required IGC code 13.3.5. (at the
first occasion of full loading after delivery and after each dry docking,
testing of high-level alarms is to be conducted by raising the cargo liquid
level in the cargo tank to the alarm point). |
HUMAN |
8.6.1 |
The required
IGC test 13.3.5, testing of high-level alarms to be done at first full
loading after delivery. Vessel delivered March 2023 and test carried out
December 2024. |
PROCESS |
8.6.3 |
There were no
records available of inspections, tests and maintenance carried out on the
cargo tank relief valves including: Six-monthly visual inspections. Annual
verification of free operation using a field test kit, according to the
vessel operational manual (Maker’s manual). Human: The
following tests required by the maker could not be documented: Six-monthly
visual inspections. Annual verification of free operation using a field test
kit, where applicable according to the vessel operational manual and/or
instructions. |
Human |
8.6.3 |
The following
tests required by the maker could not be documented: Six-monthly visual
inspections. Annual verification of free operation using a field test kit,
where applicable according to the vessel operational manual and/or
instructions |
HUMAN |
9.1.1 |
The hydraulic
jack pressure gauge had not been calibrated before use 05 March 2024. |