Date: 02-12-2024
Place: Rotterdam, Netherlands
Inspector: Bogdan Sandrea
ELEMENTS |
SIRE 2.0 REF |
OBSERVATIONS |
Hardware |
2.4.1 |
Discharging
Systems: Maintenance task available — not completed. The ballast tanks
external cofferdams were filled with glycol over the recommended level, which
was exceeded by approximately 30%. |
Hardware |
9.3.1 |
Anchors And
Chains: Maintenance task available — not completed. Several studs were
observed damaged - they were belonging to the port side anchor cable, The
observation was recorded as it was not included in the defects list presented
to the inspector, which contained only closed items. Several studs
belonging to the port side anchor cable were found loose, thus not serving
their purpose. The same anchor has been used prior entering the port. |
Human |
4.2.1 |
The
operator’s passage plan was including two sources for calculating the squat,
one where the block coefficient was taken from the hydrostatic particulars
and one where it was calculated. The observation was raised as the OP did not
complete the form by not inserting the table values since the two block
coefficient values were different, a minor value was obtained, 3 cm, this
negligible. 1. Recognition of Safety criticality
of the task or associated steps 2. Custom and practice surrounding
use of procedures |