SIRE 2.0 REF

OBSERVATIONS

Process

3.2.6     

The initial engineering audit was conducted by the vessel manager, a former chief engineer, on 29-30 May 2024. The PIQ stated 12-21 July 2024. This audit was actually conducted by a former senior deck officer.

Hardware           

5.8.1     

No proper fall prevention device (cage or equivalent stainless-steel wire with fall preventing device/belt) was fitted on the elevated ladders of the forward mast and the Xmas tree.

 

Hardware           

8.3.2     

One of both fixed oxygen detectors monitoring the air in the nitrogen generator area showed 22.2%. The PMS required a 3-monthly calibration checks. The last check was completed on 21 September 2024.Rectified during the inspection.

Human                 "Junior Engineer Officer: Not as expected.

 

 

"Junior Engineer Officer: Not as expected. The OP had not detected the high reading of one of both fixed oxygen analysers in the nitrogen generator area while the remote

oxygen reading was located near the entrance of the engine control room."

Human  "Senior Engineer Officer: Not as expected.

 

 

"Senior Engineer Officer: Not as expected.

The OP had not detected the high reading of one of both fixed oxygen analysers in the nitrogen generator area while the remote oxygen reading was located near the entrance of the engine control room."