SIRE 2.0 @ China

SIRE 2.0 @ China
CCR/Deck - 2.5 hours

On Deck 
1. CO2 operating procedure
2. Lifeboat duties asked to Gangway Watchman
3. Mooring Rope Swap plan
4. Eductor discharge procedure for forward pump room.
5. Company procedure and requirements for spare for mooring equipment 
6. What type of inhibitors are used in cargoes and their specifications 
7. Vent Mast fire extinguishing procedure
8. Action in case of cargo leaks to Hold space at Port .

In CCR

1. All files - mooring , vgp , risk assessments, permits , enclosed space etc
2. Gas detector requirements,alarms 
3. Show calibration of GX 8000
4. Cyber security policy
5. As per latest MLC amendment what steps you have taken for women seafarer onboard
6. Loadicator test requirements 
7. Pressure testing requirements and company sms verification for pipelines and equipment 
8. Garbage management plan includes any bins for e-waste separately 
9. In hospital - random checks for expiry
10. Gallery - Asked cck about ventilation 


Inspector was cross questioning for every answer - mostly looking if checklist RA or SMS contains the same.
Observation received from Deck and CCR - Nil

Quick Links:-

Get In Touch:-


  • Follow Us :-
×