Inspection
Place: Manzanillo, Mexico
Inspection
Place: Santos.
Master
1. Updated hvpq and piq.
2. Defect list and company procedure for the same.
3. Updated index of certificates.
4. Latest class survey status.
5. Last tech and marine suptt visit reports and capa.
6. Weekly, monthly lsa & ffa inspection record checked.
7. Rest hours file. Checked last drug and alcohol test
record and checked timings in rest hours.
8. Hot work permit file. Vessel has no records.
9. Ozone depleting substances record.
10. Drill records and company procedure for the
same. Risk assessment prior to the drill.
Requirement to record the safety considerations
For conducting the drill. Company generated form should
cover the safety considerations.
11. Safety inspection checklist and the areas covered.
12. Bunker delivery notes , analysis reports and
lube oil analysis procedure
13. Static navigational, mooring audit and cargo
audit (audit report to include qualification and sea time experience of
assessor.
14. Asked oiler in masters’ room about work
planning meeting done every day. If yes, who keeps record and to bring the
same.
15. Lifeboat / rescue boat lowering record.
16. Enclosed space entry procedures and drill record. Asked
ab and oiler about enclosed space entry. Wanted to hear the word “permit”.
17. Safety familiarization records and company
procedure for the same. Asked ab and oiler questions from familiarization
checklists.
18. Called eto in masters’ cabin and asked about fire alarm
delay and 220 v / 440 v faults if any.
19. Called ab in masters’ cabin and questions on safety
while working at height, in enclosed space, while mooring amongst many.
20. Record of ballast tank inspection & cargo tank
inspection checked.
21. Safe manning compared with crew list.
22. Near miss / hazrep file checked.
23. Oil record book part i, garbage record book, ballast
water record checked.
3rd officer
1. During deck rounds, told me to start the emergency gen. Also, what all means of starting and upto what pressure to pressurise during manual hand cranking to start the generator.
2. Asked me to show gx-8000 gas meter and tell what all
gases it measures, thereafter questioned the difference between lel and vol hc.
3. Asked about launching procedure and operation of davit
for liferaft and rescue boat.
4. Asked difference between tankscope and explosimeter and
asked if what kind of gas meter we have onboard.
5. Cause and effect of pressing ESD.
2nd officer
1. Asked company procedure about ecdis layer information.
2. Asked about ais not to be used for collision avoidance in
company procedure.
3. Current voyage passage plan security RA.
4. Radar maintenance as per company procedures. Magnetron
last changed?
5. Speed log connected to radar.
6. Difference between x and s band radar, when to use.
8. Master and pilot exchange with ukc sheet, min ukc
required mentioned.
9. Ais testing as per company procedure , ais static data
checked.
10. Master standing order with bcr and cpa.
When master to con procedure on master standing order.
Passage plan checked (company procedures for ship staff to perform security risk assessment for the voyage.)
11. Asked about company look ahead settings and checked in
ecdis
12. Steering gear test before arrival to this port, pre
arrival checklist checked by inspector.
12.er watch level for each leg in passage plan.
13. Company procedure for ra to be carried out for passage
plan.
14. External nav audit checked asked about the audit report
to include qualification and sea time experience of assessor.
15. Bridge watch composition as per company procedure.
1. Checked ship shore safety checklist.
2. Asked for working condition of gas meters &
calibration procedure
3. Bwts responsible officer for operation, procedure &
maintenance schedule.
4. Pre-cargo meeting details
5. Checked cargo plan in detail
6. Checked loadicator
7. Fgds details & calibration procedure
8. Mooring inspection records & calibration cert for
press gauge of break testing kit
9. Pre arrival checks & records
10. Enclosed space entry permits & rest hours
Deck crew
1. Enclosed space rescue operation, permit system & company procedure
2. Rescue boat lowering procedure in detail
3. Location of esd & when to press
4. Ppe for various jobs
Deck rounds
General rounds and checks.
Engine room
1. Pipelines labelling and coding- checked pipelines.
2. Toolbox meeting and risk assessment- is there a note made
anywhere that a risk assessement is discussed prior to doing jobs- 2/e work
done notebook.
3. Arrival and departure checklist
4. Ums procedures and deadman’s alarm
5. Insulation mats- certification and markings on the mats.
Slipping hazard.
6. Hazard markings on the stairways and steps on the
platforms- zebra markings to be done.
7. Ows- operation and alarm testing procedure- sms
requirement
8. Looked extensively in the bilges. We had a choked drain,
which had caused oil/water emulsion to leak into the tank top. We were able to
clean this up. He looked at the work done and asked us to clean it up.
9. Blackout recovery procedure from deadship condition.
Blackout test
Emergency steering procedure and last done date.
Since the annual surveyor had tested the emergency generator
and did an actual blackout and deadship recovery test, sire inspector did not
venture into those details ( as he had seen all the alarms and the actual
process).
9. Fire alarm testing and procedure. What happens if the
fire alarm is not acknowledged within 2 mins. And where is this given in the
regulations.
Tested fire alarms. Looked at all the fire detector’s
identification marks.
10. Main engine omd testing procedure and if it had been
posted there in ecr.
11. Pms and overdue items.
12. Rest hours- looked at ums hours and ums alarms. Rest
hours filled according to ums alarms and same logged in er log book.
12. Er log book entries for eca changeover.
14. Sulphur record book and er logbook entries matching for
changeover.
15. Fuel changeover procedures and if they are posted in the
ecr for reference.
16. Earth fault indicator and how to test the alarm.
17. Anti splash tapes on the fo and lo lines.
18. Nox files and entries
Orb and entries.
19. Checked the ows 15ppm alarm testing entries and last ows
operation date.
20. Manning level for engine room. Entry has to be made
everyday in the er log book.
21. Garbage station in the engine room. Duties and
responsibilities as per gmp to be posted in er.
22. Checked fire doors and the auto closing function. The
fire doors in er was checked for proper sealing.
23. Asked about stern tube and cpp oil testing and analysis
report.
Inspection at kashima, Japan
Nationality: Korean
Vessel comment: Inspector was not that co operative, wanted point to point answers to his questions, didn't like beating around the bush, got upset plenty time. Didn't have any food or beverages onboard except for a cup of coffee while preparing his report in the end, didn't like disturbance of any sort while he prepared his final report.
Date : 06 July 2025
Port : Sao Luis, Brazil
Date: 11-11-2024
Place: Rotterdam, Netherlands
|
ELEMENTS |
SIRE 2.0 REF |
OBSERVATIONS |
|
Process |
3.2.6 |
The initial
engineering audit was conducted by the vessel manager, a former chief
engineer, on 29-30 May 2024. The PIQ stated 12-21 July 2024. This audit was
actually conducted by a former senior deck officer. |
|
Hardware |
5.8.1 |
No proper
fall prevention device (cage or equivalent stainless-steel wire with fall
preventing device/belt) was fitted on the elevated ladders of the forward
mast and the Xmas tree. |
|
Hardware |
8.3.2 |
One of both
fixed oxygen detectors monitoring the air in the nitrogen generator area
showed 22.2%. The PMS required a 3-monthly calibration checks. The last check
was completed on 21 September 2024.Rectified during the inspection. |
|
Human "Junior Engineer
Officer: Not as expected. |
|
"Junior
Engineer Officer: Not as expected. The OP had not detected the high reading
of one of both fixed oxygen analysers in the nitrogen generator area while
the remote oxygen
reading was located near the entrance of the engine control room." |
|
Human "Senior Engineer Officer: Not as
expected. |
|
"Senior
Engineer Officer: Not as expected. The OP had
not detected the high reading of one of both fixed oxygen analysers in the
nitrogen generator area while the remote oxygen reading was located near the
entrance of the engine control room." |
Date: 11-11-2024
Place: Mejillones, Chile
|
ELEMENTS |
REF |
OBSERVATIONS |
|
Human |
8.99.8 |
In the
midship open deck were observed 5 cargo hoses horizontally stored and they
were not protected from direct sunlight (Tanker safety guide chemicals K.6.) |
|
Process |
9.1.1 |
The mooring
winches brake testing on 07 February 2024 However there was no evidence that
the pressure gauge of the hydraulic jack was calibrated before testing the
brakes. |
|
Photographs |
11.1.2 |
The picture
taken from port side. Also unable to see the end of the starboard side. |
|
Photographs |
11.1.3 |
The picture
shows starboard side. Unable to see the end port side of the hull. |
|
Photographs |
11.1.4 11.1.6 11.1.19 11.1.26 11.1.42 |
The picture
is port side. Picture not
taken from same angle and doesn't match the guidance photo. Picture
should be from Midship. The picture
doesn’t show the OWS. The vessel
was not provided with cargo pump room. |
Date: 17/11/2024
Place: Rodeo, USA
|
ELEMENTS |
SIRE 2.0 REF |
OBSERVATIONS |
|
Hardware |
2.3.1 |
There was a
gap between the engine block and the deck adjacent that could provide a fall
hazard |
|
Process |
2.8.1 |
The CVIQ
information was not communicated to the inspector through the tablet until 16
hours prior to the inspection which was not in line with OCIMF requirements
for a SIRE 2.0 inspection. |
|
Hardware |
5.10.2 |
The shore
gangway provided for access to the vessel was not in good condition as one of
the stanchions was broken and temporarily repaired |
|
Hardware |
8.3.20 |
There was no
separate P/V valve associated with the emergency inerting arrangement for the
ballast spaces. |
Date: 30/11/2024
Place: Singapore
|
ELEMENTS |
SIRE 2.0 REF |
OBSERVATIONS |
|
Process |
2.2.1 |
The last two
visits by superintendent were within 7 months, but the 2nd last and 3rd last
visits as declared in the PIQ were with a gap of more than 7 months. |
|
Hardware |
5.4.2 |
A screw
driver was required to open the fuel tank inspection cover for freefall
lifeboat the tank fuel level. The screwdriver was missing. |
|
Hardware |
5.8.1 |
Bunker line
dresser coupling and it’s nuts bolts near manifolds was heavily corroded. |
|
Hardware |
5.8.1 |
Electric
conduit leading to deck lamp post was corroded heavily for a length of about
2.0 M in midship area |
|
Hardware |
5.8.2 |
The exhaust
pipe for hydraulic power pack with temp 58 deg C was not marked with a hot
surface warning sign. |
|
Process |
5.8.2 |
Safety
inspection of engine room did not identify hot surfaces liable to cause burn
to human. |
|
Hardware |
9.1.1 |
The pressure
gauge used for mooring winch brake testing in Apr 2024 was not calibrated
before testing of winch brakes. |
|
Human |
9.1.1 |
OP did not
follow Company procedure to calibrate the pressure gauge of winch brake
testing kit before testing the winch brakes in Apr 2024. |
|
Photographs |
11.1.3 |
The photo
uploaded was not as per OCIMF guideline. |
|
Photographs |
11.1.42 |
Vessel was
fitted with Framo pumps but a photo was not uploaded by the operator. |
Date: 02-12-2024
Place: Rotterdam, Netherlands
|
ELEMENTS |
SIRE 2.0 REF |
OBSERVATIONS |
|
Hardware |
2.4.1 |
Discharging
Systems: Maintenance task available — not completed. The ballast tanks
external cofferdams were filled with glycol over the recommended level, which
was exceeded by approximately 30%. |
|
Hardware |
9.3.1 |
Anchors And
Chains: Maintenance task available — not completed. Several studs were
observed damaged - they were belonging to the port side anchor cable, The
observation was recorded as it was not included in the defects list presented
to the inspector, which contained only closed items. Several studs
belonging to the port side anchor cable were found loose, thus not serving
their purpose. The same anchor has been used prior entering the port. |
|
Human |
4.2.1 |
The
operator’s passage plan was including two sources for calculating the squat,
one where the block coefficient was taken from the hydrostatic particulars
and one where it was calculated. The observation was raised as the OP did not
complete the form by not inserting the table values since the two block
coefficient values were different, a minor value was obtained, 3 cm, this
negligible. 1. Recognition of Safety criticality
of the task or associated steps 2. Custom and practice surrounding
use of procedures |
Date : 01-12-2024
Place: Singapore
|
ELEMENTS |
SIRE 2.0 REF |
OBSERVATIONS |
|
Hardware |
2.1.1 |
A short-term
ballast water management system certificate was issued on 28 Nov 2024, valid
until 27 Jan 2025, due to port side BWTS was inoperative due to defective
flow meter, while starboard side BWTS was functional. Above finding was also
recorded in the open defect list. |
|
Human |
2.8.1 |
1.5.6.1- Last
special survey date was inaccurate. |
|
|
|
10.9.1 crane
last annual and 5 yearly dates were inaccurate." |
|
Human |
3.2.7 |
Comprehensive
mooring and anchoring audit report was not available on board, however, as
per the company's internal audit procedure the scope of internal audit covers
the requirements of mooring and anchoring procedures. |
Date: 27-11-2024
Place: Tauranga, New Zealand
|
ELEMENTS |
SIRE 2.0 REF |
OBSERVATIONS |
|
Hardware |
2.4.1 |
Light indication of 1S Water Ballast Tank on the control panel in
Cargo Control Room was on (showing open status) while the valve was in shut
position. Valve status was highlighted by ship staff by writing letter 'S'
with a marker next to the valve. During the opening meeting it was reported
that there were no open items in the defect reporting system. |
|
Human |
|
Valve
indicator issue was raised as a defect (called Findings within the computer-based
reporting system) as 'Observation: OBS-V-1063' on 11 Nov 2024. However, the
issue was closed out in the system on 22 Nov 2024 by OP in consultation with
company's technical department, in anticipation of receipt of spares at next
port, even though the issue had not yet been rectified. |
|
Human |
4.4.2 "Junior Deck Officer: Exceeded
normal expectation |
OP explained
the procedure for use and testing of SART with reference to company procedure
and on board equipment in detail. |
|
Hardware |
5.8.1 |
"Water
condensation droplets were visible and there was approximately 5 ml
accumulation of water at the bottom of the glass cover of emergency light
fitted at embarkation platform of port side lifeboat. This was rectified
during the inspection. |
|
Human |
|
During last
weekly testing of emergency lights, OP did not notice the condensation and
accumulation of water inside the glass cover of emergency light located at
embarkation platform of port side lifeboat. |
|
Hardware |
5.10.7 |
Escape route
from the accommodation to the shore means of access was not marked as
required by company procedure (Oil Tanker Manual, Section 3.1.5). |
|
Human |
|
OP was not
aware of the company procedure which required the escape route from the
accommodation to the shore means of access to be marked. |
|
Photographs
|
11.1.40 |
"Photo
was not provided stating 'Not Fitted'. A large capacity P/V valve was fitted
to the main inert gas line as pressure/vacuum-breaking (P/V) device. Photo
added. |
Date: 18-Dec-24
Port: Grangemouth, UK
|
ELEMENTS |
SIRE 2.0 REF |
OBSERVATIONS |
|
Hardware |
2.1.1 |
The
continuous synopsis record form #3, record of changes, was not available on
file to show the changes from CSR 1 to CSR 2. This was rectified within the
inspection period. |
|
Human |
2.1.1 |
A previous
senior deck officer had not followed the Operators procedures having not
completed form #3 of the continuous synopsis record to indicate the changes
made from CSR 1 to CSR 2 |
|
Process |
2.8.1 |
The HVPQ item
10.1.4 listed the motive power for all winches as being electric. The
observed motive power was hydraulic. |
|
PROCESS |
3.3.4 |
The
operator’s procedure requiring a validity of five years on engineer officers
shore-based engineering management simulator course was introduced in
September 2024. records indicated that one senior engineer officer had not
attended a simulator course within the last five years. |
|
Hardware |
5.8.1 |
There were
three points of direct access to the poop deck mooring area that did not have
any warning signs for entering a hazardous area. This was rectified prior to
completion of the inspection. |
|
HUMAN |
9.1.1 |
Previous crew
members had not ensured that the manometer fitted to the hydraulic jack had
been calibrated before use. |
|
HUMAN |
5.8.1 |
The OP had
not considered crew accessing the poop deck from the indicated points. |
|
Hardware |
5.10.1 |
The heaving
line was found attached to the pilot boarding buoy. |
|
HUMAN |
5.10.1 |
The
operators’ procedures had not been followed. The OP had not seen that the
line was attached to the pilot boarding buoy prior to the inspector’s
observation. The OP correctly identified the issue and rectified immediately. |
|
HUMAN |
5.10.1 |
The OP was
not aware that the heaving line should not be attached to the pilot boarding
buoy. |
|
Hardware |
9.1.1 |
There was no
evidence available to show that the manometer on the hydraulic jack for winch
break render tests had been calibrated prior to use. |
Date: 14-Sep-24
Place: VIZAG, INDIA
|
ELEMENTS |
SIRE 2.0 REF |
OBSERVATIONS |
|
HARDWARE |
5.8.1 |
1. The port
side bunker manifold flanges were heavily corroded. 2. No.4S
cargo pump junction box was noted in corroded condition. 3. The
electrical cables passing through branch conduits pipes of the electrical
pumps of all 4 pumps were noted corroded and holed. 4. The
forecastle deck, poop deck and monkey island were noted with spot rust
covering about 30-40% area " |
|
HARDWARE |
5.8.4 |
The instinsically light at the entrance pf
the compressor room was noted in corroded condition at one end. |
|
HARDWARE |
6.5.2 |
Solenoid valve of the incinerator was
getting stuck when the sluice inside door not closed alarm was tested. |
|
HARDWARE |
9.1.1 |
1.All the
winches in the poop deck and aft spring winch were fitted with double brake
bands. 2. The
forward spring winch aftermost drum brake band had thinned down and cheek
plates were corroded." |
|
HARDWARE |
11.1.26 |
The purifier
space photograph was provided instead of an oily water separator. |
|
HARDWARE |
11.1.29 |
The boiler top
was represented instead of control panel.
|
|
PROCESS |
2.1.1 |
1. The safety
construction certificate provided was not with the last endorsement of the
outside of the ship's bottom which was on 12 Aug 2024 as per CSSR. The
certificate available on the repository was with last bottom inspection as 25
Aug 2021. 2. The international Air Pollution
certificate (IAPPC). IAPPC record of Construction and Equipment and
Conditional Asssessment Programme (CAP) certificate was not provided in the
certificate repository. 3. As per the
PIQ the last visit by class was 23 Sep 2023 for annual survey, whereas as per
CSSR and class survey report, the class had last visited the vessel on 12 Aug
2024 for intermediate survey.
4. The safety construction certificate, loadline cert, safety radio
certificate, safety equipment certificate, international oil pollution cert,
international ballast water management cert and certificate of fitness
provided in the certificate repository were last endorsed by class on 23 Sep
2023 for annual survey and not provided with the latest endorsement for the
intermediate survey on 12 Aug 2024. 5. The safety management certificate, ship
security certificate and maritime labour convention cert provided in the
certificate repository did not include the latest endorsement by class dated
12 Aug 2024. 6. The document of compliance provided in
the certificate repository did not include the latest annual endorsement for
24 Jul 2024. |
|
PROCESS |
2.8.1 |
As per the
HVPQ dated Sep 2024, the following information was inaccurate:
1. Section 1.5.11 Date of
Annual survey was 12 Aug 2024, whereas this was the last date of the
intermediate survey. 2. Section
2.1.5 certificate dates a. The date of last annual for the statutory
certificates was 12 Aug 2024, whereas this was the date of last intermediate
survey. b. The dates of last endorsement of the statutory and applicable
certificates were blank. 3. Section 7.1.1 Cargo tank coating, the
last inspection dates of cargo tanks were blank. 4. Section
7.1.3 Ballast tank coating. No.4 DB(P&S) tanks last inspected date was 10
Sep 2023, whereas as per tank inspection reports were inspected on 06 Aug
2024. 5. Section
10.9.1 details of cranes. The last annual test of hose handling crane and
provision cranes was 23 Aug 2020, whereas as per cargo gear book the last
annuals of these cranes was 26 Feb 2024. |
|
PROCESS |
3.2.2 |
The details
of the qualifications and pertinent seafaring experience of the assessor were
not included within the navigational report. |
|
PROCESS |
3.2.5 |
The cargo
audit date range and activity accessed were not declared in the PIQ. |
|
PROCESS |
3.2.6 |
The
comprehensive engineering audit range and activity accessed were not declared
in the PIQ. |
|
PROCESS |
5.8.1 |
Mooring areas
were not covered in the main deck safety inspection checklist. |
|
PROCESS |
5.8.5 |
There was no
checklist provided to facilitate the safety inspections of the forecastle. |
|
PROCESS |
8.6.4 |
Emergency
procedures single tank gas-freeing was not included in the cargo operational
manual. |
|
HUMAN |
2.4.1 |
The company's
procedure required defects to be input in the PMS, 7 defects were input in
the other in-house software JIbe and were not recorded in the PMS. |
|
HUMAN |
4.3.2 |
The
composition of the engine room team was not recorded in the engine log book.
Only E2 watch level recorded without the no of persons |
|
HUMAN |
4.3.3 |
The times of
the transfer of the conn between the master and between the Pilot and master
was not recorded in the bell book or deck log book. |
|
HUMAN |
5.4.1 |
The OP was
not aware of the onload release mechanism of the lifeboat. |
DATE: 22-Dec-24
PORT: Finland - Porvoo
|
ELEMENTS |
REF |
OBSERVATIONS |
|
|
PROCESS |
3.2.1 |
The static
navigational assessment report was not substantially in alignment with the
guidance document "A Guide to Best Practice for Navigational Assessments
and Audits" and the best practice guidance under TMSA KPI 5.2.2. |
|
|
PROCESS |
3.2.5 |
The cargo
audit report stated in the PIQ was part of the ISM audit and not a
comprehensive cargo audit in compliance with TMSA 6.4.2 |
|
|
PROCESS |
8.6.1 |
The operator
did not have a policy or PMS job for the required IGC code 13.3.5. (at the
first occasion of full loading after delivery and after each dry docking,
testing of high-level alarms is to be conducted by raising the cargo liquid
level in the cargo tank to the alarm point). |
|
|
HUMAN |
8.6.1 |
The required
IGC test 13.3.5, testing of high-level alarms to be done at first full
loading after delivery. Vessel delivered March 2023 and test carried out
December 2024. |
|
|
PROCESS |
8.6.3 |
There were no
records available of inspections, tests and maintenance carried out on the
cargo tank relief valves including: Six-monthly visual inspections. Annual
verification of free operation using a field test kit, according to the
vessel operational manual (Maker’s manual). Human: The
following tests required by the maker could not be documented: Six-monthly
visual inspections. Annual verification of free operation using a field test
kit, where applicable according to the vessel operational manual and/or
instructions. |
|
|
Human |
8.6.3 |
The following
tests required by the maker could not be documented: Six-monthly visual
inspections. Annual verification of free operation using a field test kit,
where applicable according to the vessel operational manual and/or
instructions |
|
|
HUMAN |
9.1.1 |
The hydraulic
jack pressure gauge had not been calibrated before use 05 March 2024. |
Date: 18-Dec-24
Port: Grangemouth, UK
|
ELEMENTS |
SIRE 2.0 REF |
OBSERVATIONS |
|
Hardware |
2.1.1 |
The
continuous synopsis record form #3, record of changes, was not available on
file to show the changes from CSR 1 to CSR 2. This was rectified within the
inspection period. |
|
Human |
2.1.1 |
A previous
senior deck officer had not followed the Operators procedures having not
completed form #3 of the continuous synopsis record to indicate the changes
made from CSR 1 to CSR 2 |
|
Process |
2.8.1 |
The HVPQ item
10.1.4 listed the motive power for all winches as being electric. The
observed motive power was hydraulic. |
|
PROCESS |
3.3.4 |
The
operator’s procedure requiring a validity of five years on engineer officers
shore-based engineering management simulator course was introduced in
September 2024. records indicated that one senior engineer officer had not
attended a simulator course within the last five years. |
|
Hardware |
5.8.1 |
There were
three points of direct access to the poop deck mooring area that did not have
any warning signs for entering a hazardous area. This was rectified prior to
completion of the inspection. |
|
HUMAN |
9.1.1 |
Previous crew
members had not ensured that the manometer fitted to the hydraulic jack had
been calibrated before use. |
|
HUMAN |
5.8.1 |
The OP had
not considered crew accessing the poop deck from the indicated points. |
|
Hardware |
5.10.1 |
The heaving
line was found attached to the pilot boarding buoy. |
|
HUMAN |
5.10.1 |
The
operators’ procedures had not been followed. The OP had not seen that the
line was attached to the pilot boarding buoy prior to the inspector’s
observation. The OP correctly identified the issue and rectified immediately. |
|
HUMAN |
5.10.1 |
The OP was
not aware that the heaving line should not be attached to the pilot boarding
buoy. |
|
Hardware |
9.1.1 |
There was no
evidence available to show that the manometer on the hydraulic jack for winch
break render tests had been calibrated prior to use. |
Date: 23-Dec-24
Port : Unites States of America - Freeport
|
ELEMENTS |
SIRE 2.0 REF |
OBSERVATIONS |
|
HARDWARE |
2.4.1 |
Fixed
temperature readout for no.3 cargo tank middle was showing about (-) 2
degrees more than that of other tanks. The difference persisted on previous
cargo operation. |
|
HUMAN |
2.4.1 |
OP did not
include the erratic readout temperature sensor in defect list for middle
level of cargo tank no 3P. |
|
PROCESS |
12.2.1 |
Question no.
4.1.1, 10.1.3.2, 10.1.6, 10.2.1, 10.8, 10.10.6, 10.10.7 & 11.3 were
incomplete or blank. |
|
HUMAN |
3.5.1 |
Safety and
security familiarization checklists for the operator's superintendent who
stayed onboard from 25 to 27 Nov 2024 were left blank for following sections:
1. Time of boarding. 2. Time familiarization completed. 3. Important
information containing 11 items being required to be ticked. |
|
PROCESS |
4.2.3 |
Master's
standing order did not include the minimum BCR permitted during normal
navigational watches. The minimum required BCR of 2 miles was added to the
standing order during the inspection. |
|
HUMAN |
5.1.16 |
The drill
scenarios were unrealistic or inadequate to test the shipboard emergency
plan. Last two 6 monthly drill records dated 25 Apr and 30 Oct 2024 were the
same with wording, scenario, and location of the engine room. |
|
HUMAN |
5.5.1 |
OP in charge
of the paint store was not aware of the location of exhaust fan switch for
the space. A notice 'Ventilate before entry' was prominently marked at the
entrance door. |
|
HARDWARE |
5.6.1 |
A portable
multi gas detector measuring for O2 and HC in inerted condition was found in
erratic readout when sampling oxygen content in cargo hold no.3 as indicated
over 8.5%, while oxygen content sampled by two other detectors showed below
5%. The detector was made operational after recalibration. |
|
HARDWARE |
9.1.1 |
The hydraulic
jack pressure gauge had not been calibrated before use where brake testing
equipment was carried. A requisition for calibration was raised. |
Date: 08-Jan-25
PORT: Singapore
|
ELEMENTS |
SIRE 2.0 REF |
OBSERVATIONS |
|
Process |
2.2.1 |
The report by
the marine superintendent was not available onboard for the declared
qualifying vessel inspection conducted from 26 December 2024 to 27 December
2024. |
|
Process |
3.2.7 |
The report
for the comprehensive mooring and anchoring audit declared through the
pre-inspection questionnaire was not available onboard. |
|
Process |
6.5.2 |
A list of
items prohibited from being incinerated was not posted in the incinerator
space. The list of prohibited items was posted and observation was rectified
during the inspection. |
|
Human |
6.5.2 |
The
interviewed engineer officer was unfamiliar with the posting of information
regarding prohibited items from being incinerated. |
DATE: 22-Dec-24
PORT: Finland - Porvoo
|
ELEMENTS |
SIRE 2.0 REF |
OBSERVATIONS |
|
PROCESS |
3.2.1 |
The static
navigational assessment report was not substantially in alignment with the
guidance document "A Guide to Best Practice for Navigational Assessments
and Audits" and the best practice guidance under TMSA KPI 5.2.2. |
|
PROCESS |
3.2.5 |
The cargo
audit report stated in the PIQ was part of the ISM audit and not a
comprehensive cargo audit in compliance with TMSA 6.4.2 |
|
PROCESS |
8.6.1 |
The operator
did not have a policy or PMS job for the required IGC code 13.3.5. (at the
first occasion of full loading after delivery and after each dry docking,
testing of high-level alarms is to be conducted by raising the cargo liquid
level in the cargo tank to the alarm point). |
|
HUMAN |
8.6.1 |
The required
IGC test 13.3.5, testing of high-level alarms to be done at first full
loading after delivery. Vessel delivered March 2023 and test carried out
December 2024. |
|
PROCESS |
8.6.3 |
There were no
records available of inspections, tests and maintenance carried out on the
cargo tank relief valves including: Six-monthly visual inspections. Annual
verification of free operation using a field test kit, according to the
vessel operational manual (Maker’s manual). Human: The
following tests required by the maker could not be documented: Six-monthly
visual inspections. Annual verification of free operation using a field test
kit, where applicable according to the vessel operational manual and/or
instructions. |
|
Human |
8.6.3 |
The following
tests required by the maker could not be documented: Six-monthly visual
inspections. Annual verification of free operation using a field test kit,
where applicable according to the vessel operational manual and/or
instructions |
|
HUMAN |
9.1.1 |
The hydraulic
jack pressure gauge had not been calibrated before use 05 March 2024. |
Date: 03.Sep.2024
Place: Nipah Anchorage, Indonesia
Total time: Around 10 hours
Inspector boarded in the morning and started his tablet near gangway only.
After being briefed by gangway crew, asked him about various alarms on ship like general emergency, fire alarm, cargo onboard.
Then to the Master's cabin & started opening meeting
Bridge
CCR
Galley.
Deck & pump room
LSA
Ballast tank
Deck machinery
ECR
Questions asked by SIRE 2.0 Inspector