Sire 2.0 with Joseph Llermanxs

Article Details

Sire 2.0

Date: 07-Jan-2025

Inspector: Joseph Llermanxs

Port: Madre De Deus,Brasil

BRIDGE - 

  1. Ecdis display settings 
  2. Company policy regarding  Ecdis  Alarm management and same in master standing orders also.
  3. CPA / TCPA / BCR in master standing orders and call master point.
  4. Company policy regarding BNWAS, and where you log down.
  5. Difference between X & S band radar.
  6. Is there any procedure stated in master standing orders regarding con with master.
  7. Cyber security in detail.
  8. Check the passage plan thoroughly, then check all the markings on Ecdis and verify in passage plan and verify entries in bell book / log book.
  9. UKC policy as per company  procedure.
  10. Check all the bridge checklist.
  11. Master pilot exchange and pilot Card checked thoroughly. 
  12. Checked all Navigation RA.
  13. Company policy regarding the anti grounding tool.
  14. VDR self test and power failure test.
  15. Difference between GPS and GNSS
  16. Steering test procedure as per solas and company procedure.
  17. Auto pilot settings as per company policy. 
  18. Checked all publications.
  19. Which point you will discuss in Navigation meeting. And where you log down. Show me last Navigation meeting points.
  20. Squat formula open sea and confined water.

Time : 1hr 20 min

Nil Remarks on Bridge.

*CE point of view:*

  1. Bunker planning till the fuel consumed completely
  2. Fuel changeover calculator,  procedures, records, ORBs, trainings
  3. Defect reporting in details including dispensation, procurement , etc 
  4. Unplanned maintenance in details, H&M , VIR defects reporting
  5. ODS documentation and records
  6. Bunker line pressure testing intervals, procedure, records, etc
  7. Bunker sample locker , msds, records of samples, latest sample condition
  8. Oxy-acetylene room inspection,  msds and last test dates

Galley

  1. Galley cooking oil records 

Safety

  1. SCBA low pressure alarm
  2. Lifeboat Engine, Steering, lights
  3.  All Emergency lights
  4. Emergency Generator start and take onload procedure from 3OFF

Cargo, Bilge and ballast

  1. BWTS room Bilge alarms,  flooding flaps
  2. Forecastles store Bilge alarms
  3. High level , overfill alarms

*In ER*

  1. Interview with 3E 4E : ORB, maintenence and operations of Incinerator, N2 plant, sewage plant
  2. Cyber security checks, enclosed space entry in details.
  3. Interview with ER rating : Hot work area, workshop safeties
  4. ETO : fire alarm testing intervals,  calibration of O2 analyser
  5. ER round : Bilge alarms, Steering gear alarms, leak off alarm ME , AE, operations and 3way valve function of OWS. Escape route Interview from ER ratings, verified all the photos,  operation of emergency fire pump, N2 plant very closely inspection.
  6. AC room, verified R449 bottles inventory as per ODS records, fire station room,

Galley

  1. Galley alarm and Cook interview. 

And all other things which junior ranks were having trouble to answer


Quick Links:-

Get In Touch:-


  • Follow Us :-
×