Sire 2.0 IN CHINA

Article Details

SIRE 2.0

29-Dec-2024

Jiangyin, China 

*BRIDGE*

  1. PL FOR ECDIS
  2. GPS ACCURACY HOW TO DECIDE HOW MUCH HDOP VALUE IS ACCEPTABLE ANYTHING MENTIONED IN SMS 
  3. AIS TESTING AS PER SMS
  4. T NP AND NAV WRNING AND NAVTEX UPDATE PROCEDURE AS PER SMS
  5. UKV POLICY CONTOUR STG 
  6. passage plan / BWL/ ERWL
  7. SCAMIN SHOULD BE OFF OR ON ? If always off why 
  8. RADAR PERFORMANCE MONITOR 
  9. which radar to use in bad weather 
  10. ECDIS FAMILIARISATION CHECKLIST FOR ALL OFFICER ONBOARD
  11. VDR DATA RENEWAL AND RECORDING HOURS
  12. ENP AND ADRS ADLL AND ENC UPDATED OR NOT CHECKED 
  13. GPS INTERFERENCE IN PERSIAN GULF IF BOTH GOS FAIL WHAT TO DO AS PER SMS 
  14. Catzoc question
  15. checked past 3 passages
  16. ECDIS AND CHECKED USER MAP MARKINGS PI ETC 
  17. SOLE LOOKOUT ON BRIDGE 
  18. BANWAS AND ECDIS SAFETY STG CHANGE ENTRY IN BELL BOOK
  19. SPEED LOG TEST AND CHECKS AND ACCURACY 
  20. GMDSS CHECKS PV TEST AND DSC TEST WITH CRS
  21. HOW TO CHANGE STRG MODE FROM GYRO TO MAGNETIC AND OFF COURSE ALARM 
  22. ECHO SOUNDER ACCURACY HOW TO CHECK 
  23. ENGINE ROOM UMS OR NOT 
  24. ALDIS LAMP AND SPARE BULB 
  25. MAGNETIC COMPASS CHECKS
  26. GMDSS BATTERY AND CHECKS
  27. ECDIS PROVIDED WITH UPS OR NOT  

Around 1 hour in bridge inspector was interested in practical aspects and maintenance of all nav equipment as per sms

Quick Links:-

Get In Touch:-


  • Follow Us :-
×